Common flushing plans mechanical seal

Auxiliary equipment includes: Seal cooler, cyclone separator, liquid seal tank and instrument.

 

There are the following flushing plans:

 

1. Plan 01, self flushing, internal circulation, equipped with organic seal.

 

2. Plan 02, no flushing, internal circulation, equipped with organic seal.

 

3. Plan 11, the pump outlet is connected with water for flushing, self circulation, and equipped with organic seal and flow control board.

 

4. Plan 13, the pump inlet is connected with water for flushing, self circulation, and equipped with organic seal and flow control board.

 

5. Plan 14 = plan 11 + plan 13, the outlet of the pump is connected with water and flushed into the mechanical seal, and the water is returned to the pump inlet from the mechanical seal outlet, equipped with organic seal and two flow control boards.

 

6. Plan 21, external cooling water, pump outlet water into the heat exchanger. Equipped with organic seal, flow control board, heat exchanger, thermometer, ball valve, etc.

 

7. Plan 23: the sealing cavity of the pump sends out circulating coolant to the heat exchanger, which is equipped with organic seal, heat exchanger, thermometer, ball valve, etc.

 

8. Plan 31, the water at the pump outlet enters into the cyclone separator. The liquid enters the mechanical seal cavity and the particles are sent back to the pump inlet. Equipped with organic seal and rotary liquid separator.

 

9. Plan 32, equipped with organic seal, thermometer, pressure gauge, flow indicator and ball valve.

 

10. Plan 41 = plan21 + plan31, equipped with organic seal, thermometer, liquid cyclone separator, ball valve and heat exchanger.

 

11. Plan 52, equipped with organic seal, pressure gauge, high pressure limit switch, ball valve, heat exchanger, high level switch and low level switch.

 

12. Plan 53a, equipped with organic seal (double face), pressure gauge, high pressure limit switch, ball valve, heat exchanger, high level switch and low level switch.

 

13. Plan 53B, equipped with organic seal (double face), pressure gauge, temperature gauge, low pressure limit switch, ball valve, accumulator, air cooler and water cooler.

 

14. Plan 53c, equipped with organic seal (double face), pressure gauge, thermometer, high level indicator, low level switch, ball valve, overflow valve, booster tank.

 

15. Plan 54 with organic seal (pressurized double end face)